Slot Room Compliance Checklist for Venue Builds

Compliance · East Coast House

Machine spacing and sightlines

Compliance starts with the layout. Machine spacing, sightlines to the cashier and cage, and clear circulation are the first things a regulator's walkthrough checks.

Monitoring and signage

Every machine needs to report to the linked monitoring system, and required signage must be present and visible. Design these in — do not retrofit them.

Access and security

Controlled access to the gaming room, the cage and the count room, with the access points and sightlines documented.

Documentation ready

A build delivered with certification, as-built drawings and a compliance file turns a handover into a clean sign-off.

Need help with this?

Talk to the East Coast House team about your situation.

Get in touch